Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector, Unpublished PhD Thesis, Department of Sociology, Lund University.

AlNasseri, H A (2015) Understanding applications of project planning and scheduling in construction projects, Unpublished PhD Thesis, Department of Construction Sciences, Lund University.

Andersson, N (2003) A mesoeconomic analysis of the construction sector, Unpublished PhD Thesis, , Lund University.

Bahrami, S (2021) Product information quality: A sustainability challenge in design and construction, Unpublished PhD Thesis, , Lund University.

Bildsten, L (2016) Purchasing in construction companies, Unpublished PhD Thesis, , Lund University.

Hooper, M (2015) BIM anatomy II: Standardisation needs & support systems, Unpublished PhD Thesis, , Lund University.

Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda, Unpublished PhD Thesis, , Lund University.

Landin, A (2000) Impact of quality management in the Swedish construction process, Unpublished PhD Thesis, , Lund University.

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete, Unpublished PhD Thesis, , Lund University.

Martínez Avíla, C (2018) Stakeholder participation in property development, Unpublished PhD Thesis, , Lund University.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry, Unpublished PhD Thesis, , Lund University.

  • Type: Thesis
  • Keywords: construction method; crafts; developing countries; health and safety; labour; skills; workforce; activity sampling; automation; industrialisation; innovation; manufacturing; performance improvement; policy; prefabrication; productivity; project cost; safe
  • ISBN/ISSN:
  • URL: https://lup.lub.lu.se/search/publication/777637
  • Abstract:
    Productivity of labour is particularly important especially in developing countries where most of the building work is still carried out on manual basis. Previous research has pointed out that productivity in the building industry is low and, in some cases, declining. Poor productivity of craftsmen is one of the causes of cost and time overruns on building projects. The objective of this research was to find the current state of efficiency of building craftsmen, the factors that affect labour productivity, and ways of improving labour productivity. There are a number of philosophies that have been proposed to improve the performance of the building industry. Most of them have been borrowed from manufacturing industry. Literature indicates that even in developed countries improvement based on these concepts has been anecdotal. Most of them have not achieved success especially in developing countries. Performance improvement for labour was addressed in this research by studying the dimensions of efficiency, effectiveness, quality, quality of work life, profitability, productivity and innovation. In order to find the state of efficiency of craftsmen, activity sampling was used. Activity sampling performed on the major activities among building craftsmen shows that craftsmen use about 40 percent of available time on productive activities and of this only about 20 percent is used for making buildings grow. It further shows that building craftsmen spend about 33 percent of the time on nonvalue adding activities. Results from a questionnaire survey indicate that ten of the most significant problems affecting labour productivity in Uganda are incompetent supervisors; lack of skills of the workers; rework; lack of tools/equipment; poor construction methods; poor communication; inaccurate drawings; stoppages because of work rejected by consultants; insecurity; tools/equipment breakdown; and harsh weather conditions. It was found out that having an educated technically qualified workforce and having an experienced diverse workforce are regarded as the greatest enablers to innovation in building firms for driving forward productivity. The effect of design on construction and the level of tax regimes are regarded the greatest barriers to innovation in building firms. The level of training in science, engineering and technical education; and the level of research and development at the national level are looked at as the greatest enablers to innovation in building that will drive forward productivity. The size of the domestic market and the level of security are the worst barriers to innovation that lead to low productivity in the building industry in Uganda. The factors that affect the effectiveness of building craftsmen have been identified and ranked. According to the survey of workers, the most critical factors to address are the level of financial rewards, inability to achieve personal goals and poor level of training. In addition, workers are not satisfied with the level of participation in decision-making. There is a need to find solutions in these grey areas in order to improve the organisational effectiveness of building firms. To investigate the quality of work life, the degree of industrialisation was investigated. Case studies were used to assess the level of industrialisation in Uganda and the effect on productivity. The studies included the level of prefabrication; extent of use of mechanisation; degree of automation; use of robotics; reproduction; degree of standardisation; professionalised skilled labour; continuity of production; research and development (R&D); use of labour-saving technologies; extensive use of forms and types of contract used. Results indicate that these are lacking and that the cost of labour is of the order of 30 to 40 percent of project costs and therefore labour is a significant factor in the cost of building. The quality of work life was also reflected in accidents on work sites. The major causes of reportable accidents in Uganda are being hit by objects, falls, machine injuries, and cuts from tools and materials. Accidents cause about 37 percent permanent incapacity for those workers who are affected hence greatly reducing their productivity. In order to look at the profitability and therefore the benefit they receive from clients, the roles of the client in having a more efficient building process were investigated. The three roles in which clients were found to be most defaulting are payment of contractors on time, lack of support on training and inadequate support for worker health and safety. The barriers to waste minimisation efforts in the Uganda’s context have been identified and a graphical aid is provided to enable decision makers to concentrate their efforts on the most influential (strongest), yet easy to overcome barriers. The barriers that were identified as strong but easy to overcome include lack of provision of inputs just when required i.e. pull driven scheduling, and inability of teams to maintain alignment with other teams. These findings should be addressed by policy makers, practitioners and researchers in order to increase labour productivity. There is need for further research to improve productivity in the building industry.

Olander, S (2006) External stakeholder analysis in construction project management, Unpublished PhD Thesis, , Lund University.

Pemsel, S (2012) Knowledge processes and capabilities in project-based organizations, Unpublished PhD Thesis, , Lund University.

Persson, M H (2006) Lessons learned in knowledge management: The case of construction, Unpublished PhD Thesis, , Lund University.

Persson, U (2009) Management of sustainability in construction works, Unpublished PhD Thesis, , Division of Construction Management, Lund University,.

Stenis, J (2005) Industrial management models with emphasis on construction waste, Unpublished PhD Thesis, , Lund University.

Sunding, L (2015) On problems, joint problem solving and change: A human behavioural approach in a construction sector context, Unpublished PhD Thesis, , Lund University.

Sundling, R (2019) Factors influencing the outcome of renovation projects, Unpublished PhD Thesis, , Lund University.

Widén, K (2006) Innovation diffusion in the construction sector, Unpublished PhD Thesis, , Lund University.